2019
Sebeta , Ethiopia
Coca-Cola Sebeta project located in Sebeta town, 25 km west of the capital Addis Ababa. The project is part of Coca-Cola’s planned 300 million dollars investment in the expansion strategy in the country. The project started on June 2019, With an investment of 70 million dollars, the project area is 14.3 hectares of land. Upon completion, the factory is expected to have a manufacturing capacity of 70,000 cases of soft drinks per day.
Sika Solutions
With the project having concrete work, plastering, tiles and floor works, Sika has supplied different products to the customer request. Concrete works has been done with the supplied plasticizing admixture. Flooring works has been divided into different sections, with self-levelling epoxy and floor hardner applied as per the requirement. In addition, cross-selling was possible with supply of tile adhesives and cementitious waterproofing products.
Sika Products
Plastiment® BV-40, Sika Seal® -105, SikaCeram® -105 , SikaCeram® -205, Sikafloor® -161, Sikadur® -504, Sikafloor® -263 SL, Sikafloor®-CureHard-24
Project Participants
Owner
Coca-Cola, East Africa Bottling Share Company (EABSC)
Contractor
Elmi Olindo Contractors PLC
Electromechanical contractor
Alama Engineering PLC